Technical solutions

Waste heat recovery in the bentonite industry

Update Time: 2018-02-06 Hits: 884

User unit: Zhejiang Hongyu New Material Co., Ltd. Commissioning time: June 2017 Waste heat source:
In the bentonite production process, there are two major waste heat emission points. The first is the filter press process, which directly emits 1,500 tons of waste hot water at 70 ° C per day, and the drying process. The temperature of the exhaust gas after rotating flash drying is 90. ℃, direct discharge without use.
Use of waste heat:
1. The front part of the bentonite production process has a stirring process, which requires a large amount of hot water (1500 tons per day). The heating of this part of the hot water is completed by a gas-fired steam boiler, which is generally started from normal temperature. The recovered waste heat can be used for Early heating of hot water.
2. The drying process is to heat the air from room temperature to 240 ° C for drying by a gas hot blast stove. The exhaust temperature after drying is 90 ° C. The recovered heat can be used for the early heating of hot air.
Waste heat recovery and utilization technology scheme:
1. Waste heat recovery: design a tube-type water-water waste heat recovery heat exchanger, with cold water inside the tube and waste hot water outside the tube, the medium inside the tube is forced to flow, the medium outside the tube flows naturally, and the tube heat exchanger Submerged in waste hot water for heat exchange, the temperature of wastewater is reduced from 70 ° C to 40 ° C, the temperature of cold water is increased from 20 ° C to 50 ° C, and the hot water after the initial warming is further heated by the steam boiler to increase the temperature to the process temperature.
2. Waste heat gas waste heat recovery: design a heat pipe gas-gas waste heat recovery device, which is arranged between the bag filter and the induced draft fan, and uses the waste heat gas to heat the cold air. The temperature of the exhaust gas is reduced from 90 ° C to 60 ° C. The air is heated from 20 ° C to 50 ° C, and the hot air after preliminary heating is further heated to 240 ° C by a gas hot air furnace, and then dried in a drying device.


Flow chart:


Economic Benefit Analysis Waste Heat Recovery

Serial number

item        Head

unit

Quantity (name)

Remark

1

Heat source fluid type


Waste hot water


2

Heat source temperature

70


3

Heat source temperature after recovery

40


4

Thermal fluid flow

Kg / h

62500


5

Heat recovery

Kcal / h

1875000


6

Save gas per hour

m 3 / h

245


7

Gas prices

/m 3 Yuan / m 3

3.0


8

Annual natural gas cost savings

yuan

1764000

300 / 年、 24 小时 / 天计算 Based on 300 days / year, 24 hours / day

9

Equipment investment

yuan

2450000



Payback period

year

1.4



Waste heat gas waste heat recovery

Serial number

item        Head

unit

Quantity (name)

Remark

1

Heat source fluid type


Waste heat


2

Heat source temperature

90


3

Heat source temperature after recovery

60


4

Thermal fluid flow

Nm 3 / h

20000


5

Heat recovery

Kcal / h

186000


6

Save gas per hour

m 3 / h

twenty two


7

Gas prices

/m 3 Yuan / m 3

3.0


8

Annual natural gas cost savings

yuan

475200

300 / 年、 24 小时 / 天计算 Based on 300 days / year, 24 hours / day

9

Equipment investment

yuan

720000



Payback period

year

1.52



Use live photos: